鋼筋加工棚在現(xiàn)在建筑工地上使用很關(guān)鍵
來源:http://mpmy.cn/ 發(fā)布時間:2023-05-08
由于鋼筋加工棚的施工質(zhì)量會對后期使用的產(chǎn)生較大影響,因此,在搭設(shè)鋼筋加工棚的過程中應(yīng)注意以下施工要點(diǎn)。
Due to the significant impact of the construction quality of the steel bar processing shed on the safety of later use, the following construction points should be noted during the installation of the steel bar processing shed.
工地鋼筋加工棚_工地鋼筋防護(hù)棚_標(biāo)準(zhǔn)化制作解析
Construction site reinforcement processing shed_ Construction site steel reinforcement protection shed_ Analysis of standardized production
(1)施工前,應(yīng)先編制詳細(xì)的防護(hù)棚施工方案,并在開始施工時先對防護(hù)棚范圍內(nèi)的兩側(cè)道路進(jìn)行整平、拓寬作業(yè),設(shè)置排水溝,以確保排水暢通,適應(yīng)吊車站位及吊裝。
(1) Before construction, a detailed construction plan for the protective shed should be prepared, and before starting construction, the roads on both sides of the protective shed should be leveled and widened, and drainage ditches should be set up to ensure smooth drainage and adapt to the crane position and lifting.
(2)若鋼筋加工棚的基礎(chǔ)施工范圍內(nèi)光纜、電力線眾多,還應(yīng)制訂光纜、電力線等設(shè)備的改移方案,以及相關(guān)保護(hù)措施,以確保施工和設(shè)備。
(2) If there are many optical cables and power lines within the basic construction scope of the steel bar processing shed, a relocation plan for equipment such as optical cables and power lines should also be formulated, as well as relevant protective measures, to ensure construction safety and equipment safety.
(3)鋼筋加工棚施工時,其焊接作業(yè)的過程一定要注意防火,如果有風(fēng)必須設(shè)置好擋風(fēng)板,以免發(fā)生火花飛濺,造成隱患。同時,鋼筋加工棚上不得堆放雜物,以及鋼筋、模板等材料,以防發(fā)生火災(zāi)。
(3) During the construction of the steel bar processing shed, attention must be paid to fire prevention during the welding process. If there is wind, a wind deflector must be installed to avoid sparks and potential safety hazards. At the same time, debris, as well as materials such as steel bars and templates, should not be piled up on the steel bar processing shed to prevent a fire.
(4)按鋼筋加工棚的矩型管立桿間距、排距要求進(jìn)行定位放線,并將墊板鋪設(shè)放平穩(wěn),不得懸空。同時,矩型管立桿接長應(yīng)采用對接電焊連接,立桿對接電焊焊接應(yīng)交錯布置。
(4) Position and set out according to the spacing and row spacing requirements of the rectangular pipe upright in the steel processing shed, and lay the base plate smoothly without hanging in the air. At the same time, the extension of the rectangular pipe upright should be connected by butt welding, and the butt welding of the upright should be arranged in a staggered manner.
工地鋼筋加工棚_工地鋼筋防護(hù)棚_標(biāo)準(zhǔn)化制作解析
Construction site reinforcement processing shed_ Construction site steel reinforcement protection shed_ Analysis of standardized production
(5)鋼筋加工棚棚頂鋪裝施工時,均應(yīng)在既有線上方作業(yè),且須注意高空作業(yè),嚴(yán)禁任何機(jī)具和材料意外掉落損壞線路設(shè)備。同時,應(yīng)通過鋼管立柱,在鋼筋加工棚兩側(cè)設(shè)置接地措施。
(5) When paving the roof of the steel processing shed, operations should be carried out above the existing line, and attention should be paid to the safety of high-altitude operations. It is strictly prohibited for any machinery and materials to accidentally fall and damage the line equipment. At the same time, grounding measures should be set up on both sides of the steel processing shed through steel pipe columns.
現(xiàn)場鋼筋加工棚一般需根據(jù)施工織計(jì)劃,安置鋼筋對焊機(jī)、切斷機(jī)、彎曲機(jī)、調(diào)直機(jī)......等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場施工場地、用電等條件來確定;故鋼筋加工棚一般跨度在12~18m,,長度盡可能大于30m。
The on-site steel bar processing shed generally needs to be equipped with steel bar welding machines, cutting machines, bending machines, straightening machines, etc. according to the construction weaving plan The number of equipment and processing lines; In addition, it is necessary to consider the turnover and stacking of some raw materials and processed steel bars; Determine the construction site and electricity usage conditions on site; Therefore, the steel bar processing shed generally has a span of 12-18 meters, and the length should be as much as possible greater than 30 meters.
工具式鋼筋加工棚搭設(shè)具體尺寸根據(jù)現(xiàn)場實(shí)際情況確定。
The specific dimensions for setting up a tool type steel bar processing shed will be determined based on the actual situation on site.
搭設(shè)在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車間必須設(shè)置雙層硬質(zhì)防護(hù)。
The processing workshop set up around the turning radius of the tower crane and the building must be equipped with double layer hard protection.
加工車間地面需硬化,宜選用砼地面。
The ground of the processing workshop needs to be hardened, and concrete ground should be selected.
加工車間頂部應(yīng)張掛警示標(biāo)識和宣傳用語的橫幅,橫幅寬度宜為1m。
Safety warning signs and safety propaganda slogans should be hung on the top of the processing workshop, with a width of 1m.
工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2000mm×1000mm。
The tool type steel bar processing shed needs to be prominently hung with an operating procedure diagram board, with a size of: wide × Height=2000mm × 1000mm。
各種型材及構(gòu)配件規(guī)格為參考值,具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算。
The specifications of various profiles and components are reference values, and the specific specifications should be calculated based on local wind and snow loads.
南方地區(qū),如遇臺風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
In the southern region, if encountering a typhoon, wind prevention measures should be taken and cable ropes can be installed.
- 上一篇:工地圍擋施工的類型有哪些?
- 下一篇:鋼筋加工棚:提升施工效率的理想選擇